Custom manufacturing for global B2B projects
  • Technical review
  • Factory inspection
  • Global delivery
CHOUSE production base and modular building systems

Integrated modular building systems

Built fast.
Engineered right.

From product matching and technical development to manufacturing and site support, we turn complex building requirements into clear, executable delivery.

03 Production bases
04 Factories
15+ Years experience
30+ Technical team
Designed for complex B2B decisions
Technical feasibility
Controlled manufacturing
Phased delivery
Installation support

Core Systems / 01

Four modular building systems
for rigorous site demands.

Choose by project use, site conditions, climate, logistics volume and deployment speed—not by arbitrary catalog names.

Quick-assembly container unit Economical · 2,000 /mo
01 / System

Quick-Assembly Containers

High-density packing, knockdown components, and efficient large-scale worker camp deployment.

  • Deploy speed: Rapid manual / crane link
  • Loading efficiency: Max units per 40HQ
Flat-pack modular building Modular · 1,000 /mo
02 / System

Flat-Pack Container Units

Factory pre-assembled roof and base frames reducing on-site structural labor for offices and dormitories.

  • Pre-assembly: Roof & floor integrated
  • Modular stack: Up to 3 storeys
Folding container unit Fast · 1,000 /mo
03 / System

Folding Container Units

X/Z hinged structure folds into compact transport envelopes and unfolds in minutes for rapid camp setup.

  • Setup: Instant unfold sequencing
  • Mobility: Highly reusable relocations
Expandable container house, opened out Spacious · 200 /mo
04 / System

Expandable Housing Units

Compact shipping footprint that expands into complete multi-room residential and luxury hospitality layouts.

  • Living area: Tripled expanded footprint
  • Turnkey: Factory-fitted wet areas

Manufacturing evidence / 02

Capacity that can be
seen, checked and planned.

Scale matters only when it translates into a credible production plan, consistent QA inspection and reliable phased delivery.

Manufacturing footprint 500K

Square metres across China production bases (Guangdong, Suzhou, Anhui).

Quick-assemble capacity 2K /mo

Standard monthly production reference.

Flat-pack capacity 1K /mo

Standard monthly production reference.

Folding capacity 1K /mo

Standard monthly production reference.

Expandable & capsule combined capacity: 200 units / month. All monthly production figures subject to final specification and schedule confirmation.
Welding a modular frame on the factory floor
Visible progress at every critical stage. DELIVERY / 03

Delivery method / 03

One controlled path
from brief to handover.

01

Project definition

Site conditions, climate, structural standards, target quantity and timeline aligned before engineering begins.

Brief
02

Technical validation

Configuration drawings, wind/snow loads, connection details and materials verified prior to formal commitment.

Design
03

Manufacturing control

Raw material verification, structural welding, coating checkpoints and pre-assembly staged per batch schedule.

Build
04

Delivery coordination

Packing lists, container stuffing plans, sea-freight protection and staged discharge schedules kept transparent.

Deliver
05

Handover support

Unloading manuals, installation guidance, technical documentation and issue resolution ensure site readiness.

Support

Application Sectors / 04

Engineered for purpose-built
operational demands.

Browse how modular units configure into functional compounds, temporary living quarters and hospitality resorts.

项目设施
Application Cluster

项目设施

Specialized modular specifications engineered for 项目设施.

5 titles cataloged View sector
营地与宿舍
Application Cluster

营地与宿舍

Specialized modular specifications engineered for 营地与宿舍.

3 titles cataloged View sector
文旅住宿
Application Cluster

文旅住宿

Specialized modular specifications engineered for 文旅住宿.

2 titles cataloged View sector

Technical Domains / 05

Core technical disciplines
& manufacturing topics.

Direct access to engineering research, installation guides and logistics handbooks.

Quality discipline / 06

Trust is built from
specific evidence.

Materials, process, records and inspection make quality visible before the product reaches the site.

01

Specification control

Brands, models, dimensions and quantities are locked in writing before production.

02

Process checkpoints

Critical structural, enclosure, service and finishing stages are inspected and recorded.

03

Release discipline

Internal inspection, client review and final release create a clear shipment threshold.

Bring us the site.
We’ll define the system.

Start with your project facts: location, intended use, delivery timeline and site constraints. Our technical team evaluates feasibility before formal commitment.